RDF Power Plant Witzenhausen

Our Witzenhausen RDF power plant is the first facility in Germany that fully supplies a big industry client with alternative energy from residue-derived fuels. At the same time, it ensures that the energetic RDF recovery is environmentally friendly and efficient.

With an energy recovery of more than 60 percent, we implement the waste-to-energy concept ideally at this location.

For this, we have created a circulating fluidised bed for medium caloric residue-derived fuels. It has a thermal fuel output of 124 megawatt. B+T Ceneris supplies the plant with sufficient residue-derived fuels, disposes the accruing ashes and takes care of regular quality control.

Data of the Witzenhausen power plant

Output: 124 MW therm
Steam: 153 to/h
RDF input: 265,000 t/h
Design: Combined heat and power facility for the full coverage of a paper mill
Operator: B+T Energie GmbH

Annual emission data 2021
Annual emission data 2020
Annual emission data 2019
Annual emission data 2018
Annual emission data 2017
Annual emission data 2016
Annual emission data 2015
Annual emission data 2014
Annual emission data 2013
Annual emission data 2012
Annual emission data 2011
Annual emission data 2010
Annual emission data 2009